Finished product

Bathrooms done. We removed an existing tub and shower unit and installed a 5′ wall in Swanstone shower. Never had to touch the drain line since we used a conversion base. We did move the valve to the opposite wall, installed some grab bars and a seat. We also installed a new Starmark vanity, medicine cabinet and “Johnny wall” cabinet. A new Swanstone vanity top and Moen faucets all around.

20120127-111659.jpg

20120127-111706.jpg

20120127-111712.jpg

20120127-111720.jpg

20120127-111726.jpg

20120127-111744.jpg

20120127-111753.jpg

Published in: on January 27, 2012 at 12:18 pm  Leave a Comment  

Tub to Shower Conversion

Today we started a tub to shower conversion. We’ll be removing the 30 year old tub and tile walls and installing a new shower conversion base with Swanstone walls. We’ll also be updating the medicine cabinets and. Vanity base.

20120123-111646.jpg

20120123-111709.jpg

20120123-111657.jpg

Published in: on January 23, 2012 at 12:17 pm  Leave a Comment  

Titan tile for the showroom

All of the tile is installed in the showroom. The photo is of Florida Tile “Titan” tile. They are 18″*18″ laid on a diagonal. It’s half grouted but will be finished in the morning. Next is baseboards and more displays, looks like a late January open house.

Published in: on January 2, 2012 at 2:28 pm  Leave a Comment  