New Complete Bath Remodel

Today we started a new job. This is a complete bathroom make over. Everything goes and gets replaced with new. We’ll be doing new tile floor, shower base and tiled shower walls. The existing drywall on the exterior wall was removed to reinsulate. we’ll be installing new vanity, top, faucets, medicine cabinet, toilet, and lights. This project will take us roughly one and half to two weeks. Pictures to follow.

Advertisement
Published in: on November 14, 2011 at 8:22 pm  Leave a Comment  

The URI to TrackBack this entry is: http://houckremodeling.wordpress.com/2011/11/14/new-complete-bath-remodel-2/trackback/

RSS feed for comments on this post.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 81 other followers