We finished getting all the cabinets up today. Wrapping up a few little this on it Monday and finish painting. Then granite templating on Tuesday.
Alumax Shower-door Display
Our new shower door is up and installed. We are one of only 3 companies in Ohio offering these. Call today to see them in person.
Finished product
Bathrooms done. We removed an existing tub and shower unit and installed a 5′ wall in Swanstone shower. Never had to touch the drain line since we used a conversion base. We did move the valve to the opposite wall, installed some grab bars and a seat. We also installed a new Starmark vanity, medicine cabinet and “Johnny wall” cabinet. A new Swanstone vanity top and Moen faucets all around.
Tub to Shower Conversion
Today we started a tub to shower conversion. We’ll be removing the 30 year old tub and tile walls and installing a new shower conversion base with Swanstone walls. We’ll also be updating the medicine cabinets and. Vanity base.
Titan tile for the showroom
All of the tile is installed in the showroom. The photo is of Florida Tile “Titan” tile. They are 18″*18″ laid on a diagonal. It’s half grouted but will be finished in the morning. Next is baseboards and more displays, looks like a late January open house.
Pillars, crown, chair, and door
We are close to wrapping up our current job. We built a wall where we added a 5′ interior door. Inside the new room we installed chair rail, 5 decorative pillars with crown on top. We’ll paint in the morning and be wrapped up on another successful job.
Complete Bath Remodel
These are before photos of our current job. The shower, sink, toilet, medicine cabinet, and flooring all are getting replaced. Upon tearing out the shower we noticed that the floor had extensive water saturation, not only the floor under the shower but it stretched to a good portion of the rest of the floor. The original goal for today was to tear everything out and get the shower base in and ready for walls in the morning. After finding all the water damage we decided that the install should start Wednesday, there by giving us an extra day to try to dry out some of the floor to determine just how much will have to be tore out. We did make great strides in other areas of the job. We got everything tore out and all of the drywall patching done, the new medicine cabinet installed and a new drain box for the washing machine.





















